01 / CHALLENGE
The challenge
Delayed response (48h) and rating drop due to CS surge right after launch
Project focus
Delayed response (48h) and rating drop due to CS surge right after launch
The solution
Introduced QA-linked CS process and minimized macro answers
02 / SOLUTION
The solution
Introduced QA-linked CS process and minimized macro answers
- 01
Project focus
Delayed response (48h) and rating drop due to CS surge right after launch
- 02
The solution
Introduced QA-linked CS process and minimized macro answers
03 / RESULTS
Results in numbers
Example project
Average first response time
| Metric | Data | Context |
|---|---|---|
| Response Time | ~30 min | Early suppression |
| Store Rating | 4.5★ | Up from 2.8 |
| Resolution | 98% | Minimized unresolved |